Costing Out Sim 2: Costing out Teaching a Skill

 

The assignment is to cost out how much an IV training lab would cost.

 

Operational tasks are many:

Scheduling of the sim specialist, standardized patients, and faculty are required. Plus, getting the scenarios to the students. If written assignments are also given then getting and grading those will need to be considered.

Below are the costs of just the lab and do not include the above mentioned issues.

 

Supply costs are also numerous:

 

From "Pocket Nurse"

Hand and arm IV start practice trainer kits

Item Number: 11-81-0140N

Price $461.18 X 5 = $2305.90

 

IV Start Kit

Item Number: 06-54-3864N

Unit Price: $2.09 X 20 = $40.18

 

Sharp Box

Item Number: 03-78-8303N

Unit Price: $5.37 X 5 = $26.85

 

IV Catheters

Item Number: 33-82-2511N

Unit Price: $2.99 X 20 = $59.80

 

Baxter IV Extensions

Item Number: 06-82-8504N

Unit Price: $6.32 X 10 = $63.20

 

3ml Syringes – box 100 – need half

Item Number: 06-82-200N

Unit Price: $7.89 X .5 = $3.95

 

Total = $2698.98 for supplies

 

Standardized patients = 2 hours X 5 SPs X $15/hour = $150

Instructor to write scenario = $400

Instructor for lab = 2 hours X $50/hour = $100

Sim Specialist = 2 hours X $30/hour = $60

Personnel costs = $710

 

Personnel + Supplies = $3408.98

 

After that initial group, the $400 for sim scenario creation should be removed, so then $3008.98 for two hours of training of ten students with one instructor.

 

These prices were from Pocket Nurse on March 16th, 2016

http://www.pocketnurse.com/

 

Cost of sim lab operations, hazardous waste removal, durable medical supplies (such as beds, side tables, etc.) were not included in this estimate but would need to be considered.

Other considerations according to "Health Simulation" Top 5 Questions are:

  • Who will be providing the educator for the training?
  • AV equipment wear + tear
  • Manikin equipment wear & tear + warranty costs
  • Medical equipment wear & tear + warranty costs
  • Administrative fees (scheduling, legal contract development, parking, lunch)
  • Facilities maintenance costs (or square footage costs)
  • Facilities operational costs (water, power, etc.)
  • Marketing costs to advertise your program

Link to this list and other info is: http://healthysimulation.com/2153/top-5-questions-i-am-asked-about-managing-a-medical-simulation-program/

DRAFT: This module has unpublished changes.

Simulation Center Cost Estimates

(More detailed including building costs)

 

Quant

Description

Cost

Supplier

 

Construction costs (Sim and Skills Lab) 5500 sq ft X $300/ft

$1,650,000

NA

 

Construction costs (Offices) 6 X 120 sq ft X $300/ft

$216,000

NA

 

Construction costs (Debriefing rooms) 3 X 750 sq ft X $300/ft

$675,000

NA

 

Construction costs

$1,260,000

NA

1

SimMan 3G Manikin

$99,090

Laerdal

1

SimMom Manikin

$54,516

Laerdal

1

SimJunior

$43,130

Laerdal

1

SimNewB Manikin

$43,130

Laerdal

 

Lab Furnishings (beds, bedside tables, storage carts, chairs)

$155,000

NA

 

Office, debriefing and Reception Furniture

$150,000

NA

1

Control room equipment with sound/video

$100,000

NA

 

Flat screen tvs and IVC and wiring/install

$40,000

NA

 

Total Cost:

$4,485,866

 